Estimating Templates Remodeling

Free Hardwood Flooring Estimate Template (Excel)

Example bid in this template: $22,393 · Timeline: 1 weeks

Real-World Scenario: The Great Room Sand & Fin

Installation of 800 sq ft of Select Grade White Oak. Includes subfloor prep, installation of boards, and 3 coats of water-based polyurethane finish.

Remodeling Planning Ranges (illustrative)

Illustrative ranges for planning, not quotes or a published survey. Replace them with your own supplier prices and labor rates.

Waste Factor
Per manufacturer
Trade guidance is to follow the flooring manufacturer's recommended waste factor. About 5-10% is a common rule of thumb for a straight lay, and more for diagonal or patterned layouts.

Materials Cost Breakdown

Direct Material
Line Item Cost
White Oak 3-1/4 inch $6,200
Abrasives & Finish $850
Subfloor Prep Mat $320
Materials Subtotal $7,370

Labor Cost Breakdown

Direct Labor
Task Cost
Surface Prep $650
Installation $3,200
Sand & Finish (3 coats) $2,800
Labor Subtotal $6,650

Markup ≠ Margin — Don't Make This Mistake

A 28% markup on $14,020 gives 22% gross margin — not 28%. To hit a true 28% gross margin, divide your cost by 0.72.

→ Verify with the Profit Calculator

Frequently Asked Questions

How do I estimate a hardwood flooring job?

Measure the square footage, add a waste factor, then price materials, subfloor prep, installation and sanding and finishing separately. Add overhead and divide by (1 minus your target margin) to get the bid price.

How much waste should I allow for?

The example orders 880 sq ft of flooring for an 800 sq ft room, which is a 10% waste allowance for a straight lay. Patterns, diagonal layouts and out-of-square rooms usually need more, so adjust the waste factor to the job.

What does the example cost per square foot?

Direct cost in the example is $14,020 across 800 sq ft, about $17.53 per square foot before overhead and profit. Your own costs will differ with species, grade, finish system and local labor rates.

Why list subfloor prep as its own line?

Subfloor problems are the most common surprise on flooring jobs. A separate prep line, or an allowance with a written change-order clause, keeps uneven or damaged subfloors from coming out of your margin.

Does this template match the real-world costs you see on-site?

Your answer helps us improve our financial tools and guides for the trade.