Plumbing Estimate Template
Typical project: ยท Timeline: weeks
๐ Trade Benchmarks (avg)
Fixture Count Rate
$1,800 - $2,500
Per wet fixture installed
Service Call Rate
$175 - $350
Minimum for 1st hour
Mat/Labor Split
35/65
High skill labor dependency
๐ฆ Materials Cost Breakdown
Direct Material| Line Item | Cost | Notes |
|---|---|---|
| PEX Pipe & Fittings | $650 | Supply lines for h/c |
| PVC Waste & Vent | $480 | 3-inch stack + branch lines |
| Rough-in Valves | $350 | Pressure-balanced shower unit |
| Materials Subtotal | $1,480 |
๐ท Labor Cost Breakdown
Direct Labor| Task | Cost | Notes |
|---|---|---|
| Waste/Vent Rough | $1,800 | Core drilling + assembly |
| Supply Line Rough | $1,200 | Homerun system to manifold |
| Fixture Trim & Set | $950 | Setting toilet, sink, tub |
| Labor Subtotal | $3,950 |
โ ๏ธ
Markup โ Margin โ Don't Make This Mistake
A % markup on $5,430 gives % gross margin โ not %. To hit a true % gross margin, divide your cost by NaN.
โ Verify with the Profit CalculatorDoes this template match the real-world costs you see on-site?
Your answer helps us improve our financial tools and guides for the trade.
Quick Signal:
"Does this template match the real-world costs you see on-site?"
โ
Feedback Received
Thank you. Your real-world input helps us build better financial tools for the trade.